
Ladue, St. Louis County
Home remodeling, renovation and custom homes in Ladue
Ladue was built as houses set far from the street on wooded lots, and its zoning and Architectural Review Board still shape what any remodel or new house can look like.
Ladue took its present form in 1936, when the villages of LaDue, Deer Creek and McKnight merged, and it grew on a consistent pattern: single-family houses set far from the street and from one another on large, wooded lots reached by narrow tree-lined lanes. By the 1960s it had the lowest population density of any St. Louis suburb, partly because builders had to leave generous front, side and rear yards. That pattern is still the starting point for any project here, from a kitchen in a 1950s house to a new home on an existing lot.
Modern Design + Build is a design-build contractor based in Bevo Mill. For Ladue clients, design-build pays off early: the drawings, engineering and 3D renderings that go to the Architectural Review Board come from the same team that will price and build the work, so what the board approves is what gets built. We focus on energy-efficient and environmentally friendly building practices, and the work is run by our project managers, led by Luis Medina, with a foreman on site.
Places you will know
- Ladue Road
- Warson Road
- St. Louis Country Club
- Tilles Park
- Ladue Horton Watkins High School
- Graybridge Road
By the numbers
Ladue homes at a glance.
Source: U.S. Census Bureau, American Community Survey 2020 to 2024 5-year estimates, Ladue. Figures are estimates with margins of error.

Local homes
Revival houses, Modern landmarks and large wooded lots
Ladue's population grew 74 percent in the 1940s and 56 percent in the 1950s, and much of its housing dates from those decades. A few landmarks show the range. The 1912 Samuel Plant House on Cella Road is Georgian Revival in Flemish-bond brick under a high hipped slate roof. In 1939 architect Isadore Shank began Graybridge Road as an enclave for architects and artists, and Esley Hamilton's guide to Modern architecture in St. Louis County lists sixteen Modern Movement buildings in Ladue from 1936 to 1961, all but one of them houses. Bernoudy-Mutrux's Czufin House on Dielman Road, built in 1950 and 1951, is a split-level of brick and frame in the Wrightian manner.
Zoning sets the frame for every project. Minimum lot sizes run from 3 acres in the A district to 10,000 square feet in the E districts, and the A district requires a 75-foot front yard and 50-foot side and rear yards. A house on an undersized lot can be remodeled or enlarged only if the work does not break those yard requirements. Modern houses bring their own puzzles: slab floors with no basement, flat roofs with deep overhangs, glazed walls and built-ins, all of which make new kitchens, baths and mechanical systems a design problem as much as a construction one. Replacement is part of the picture too; the Hammerman House nomination notes a demolition and rebuild on Graybridge's original tract.
Services
What we build in Ladue.

Kitchen remodeling in Ladue
In Ladue's 1940s and 1950s houses the kitchen is often cut off from the family rooms that grew up around it, so we plan the layout, storage and light before choosing finishes.
Learn more
Bathroom remodeling in Ladue
Primary baths in houses this size are usually dated rather than cramped, so the work centers on layout, waterproofing, ventilation and finishes that suit the architecture.
Learn more
Whole-home renovation in Ladue
When kitchen, baths, systems and finishes all need work, one plan keeps the sequence right and gives the Architectural Review Board a single coherent submittal if the exterior changes.
Learn more
Historic restoration in Ladue
For revival-era houses and Modern Movement designs like those on Graybridge Road, we plan updates that keep original materials, built-ins and proportions intact.
Learn more
New homes and custom builds in Ladue
Ladue's Architectural Review Board lists new home construction first among the work it reviews, and every new house has to meet its zoning district's lot and yard rules; we bring design, engineering and construction to that process as one team.
Learn moreLadue's Building Department, part of Building and Public Works, issues building, HVAC and plumbing permits, while electrical permits are reviewed and issued by St. Louis County and the work must be done by a licensed electrician. Interior and exterior remodels need a permit, but a kitchen remodel limited to replacing appliances and cabinets does not. Contractors register with the city, filing a certificate of insurance and paying an annual license fee.
New construction and exterior modifications go to the Architectural Review Board first. The board, a committee of resident architects, reviews new homes, additions, changes to window and door configuration, porches and dormers, but not same-size replacement windows and doors or exterior painting, and approval can take two to three weeks. Before work begins, confirm current requirements with the Building Department, including whether a home sale calls for any inspection.
Guides
For Ladue homeowners.

St. Louis brick homes
Why St. Louis built in brick, how solid masonry walls handle water, and what owners should know about repointing, sealers, insulation, exposed brick and historic review.
Read the guide
Plaster walls in old houses
Old plaster is stronger, quieter and more fire resistant than drywall, and it is often in better shape than it looks. How to read the damage, which repairs work, and when replacement is the right call.
Read the guide
Old house renovation costs
Why budgets for older St. Louis homes swing so widely, where the money goes behind the walls, and how to turn your house into a number you can actually plan around.
Read the guideFAQ
Remodeling in Ladue: common questions
Does a kitchen remodel in Ladue need a permit?
Not always. Ladue does not require a permit for a kitchen remodel that only replaces appliances and cabinets. Moving walls or plumbing turns it into a remodel that needs a city permit, and electrical changes need a St. Louis County permit and a licensed electrician.
How long does Architectural Review Board approval take in Ladue?
The city says approval can take two to three weeks after submission. The board meets on the first and third Thursday of each month, with applications due a week before the meeting, so build that time into the schedule for new homes, additions, dormers, porches and window or door changes.
Can I enlarge a house on an undersized Ladue lot?
Possibly. Ladue's zoning ordinance allows existing buildings on lots below the minimum size to be remodeled, repaired, enlarged or structurally altered, but only if the change does not violate the yard requirements. Have the setbacks checked against your district before design starts.
Free consultation
Planning a project in Ladue?
Tell us about your home and what you want to change. The first consultation is free, and we reply within one to three business days.
- Ladue, Missouri, Wikipedia
- Harry Hammerman House, National Register nomination, Missouri State Parks
- Rudolph and Dorothy C. Czufin House, National Register nomination, Missouri State Parks
- Samuel Plant House, National Register nomination, Missouri State Parks
- Zoning Ordinance (updated May 2026), City of Ladue
- Architectural Review Board, City of Ladue
- Building Department FAQs, City of Ladue
- Citizen Portal, City of Ladue

