Greater St. Louis and surrounding Missouri communities. Missouri only. admin@moderndnb.com(636) 556-4626

Permits and rules

Remodeling permits in St. Louis: City, County and municipal rules

Who issues your permit depends on where the house sits: the City of St. Louis, St. Louis County or one of dozens of municipalities. How to tell, what needs a permit and what to keep for resale.

Updated October 1, 202613 min readBy the Modern Design + Build team

Modern Design + Build crew member reviewing plans on a job site

The first permit question in St. Louis is not what you are building. It is where the house sits. The City of St. Louis has been separate from St. Louis County since 1876, and the County is a patchwork of municipalities, many with their own building departments and others that contract with the County for the work. Two houses on opposite sides of a city limit can have different permit offices, different lists of work that needs a permit and different inspections when they sell.

This guide sorts out who issues permits on the Missouri side of the region, what work usually needs one and how to keep your project and its paperwork in order. Rules, fees and portals change, so read everything here as of October 2026 and confirm with your building department before work starts.

Key takeaways
  • Who issues your permit depends on where the house sits: the City of St. Louis, unincorporated St. Louis County, or a municipality that runs its own building department or contracts with the County.
  • Moving walls, plumbing or wiring almost always needs a permit. Paint, flooring and like-for-like cabinets usually do not, but each jurisdiction publishes its own list.
  • In the City of St. Louis, electrical, plumbing and mechanical permits go to City-licensed contractors, with a narrow homeowner exception for electrical work.
  • In City historic districts, even painting, windows and tuckpointing can need approval.
  • Many cities inspect homes at sale. Keep permits, approved drawings and final inspections with your house records.

Start with where your house sits

There are four basic arrangements in the City and St. Louis County.

City of St. Louis. The Building Division of the Department of Public Safety enforces the City building code, issues permits and inspects work. Its Permits Section (City Hall, 1200 Market St., Room 425, 314-622-3313) issues building, demolition, electrical, plumbing, mechanical and occupancy permits. In March 2026 the City announced its STL City Permits portal, where applicants can submit applications, upload plans, pay fees and track status online.

Unincorporated St. Louis County. Affton, Concord, Lemay, Mehlville, Oakville and Spanish Lake are census-designated places, not cities. St. Louis County's Department of Transportation and Public Works issues every permit there (41 South Central Ave., Clayton, 314-615-5184).

Municipalities with their own building departments. Kirkwood, Webster Groves, Brentwood, Clayton, University City, Ladue, Ballwin, Florissant and others issue their own building permits. Some still send trade work to the County: Maplewood, Richmond Heights and Des Peres rely on it for electrical, plumbing and mechanical permits, and Ladue for electrical.

Municipalities that contract with the County. Chesterfield, Crestwood, Fenton, Sunset Hills, Manchester, Wildwood and a long list of smaller cities contract with St. Louis County for the building code, so the County issues the permit and inspects. In the ones we checked, the city signs off first. Chesterfield requires a Municipal Zoning Approval. In Sunset Hills the zoning letter normally takes about two weeks, and the County will not accept plans without it. Crestwood requires its own Zoning Review Permit.

The County's municipal contract list (revised August 3, 2026) names more than 80 municipalities and spells out which codes the County enforces in each. It is the quickest way to see who does what in a given city.

St. Charles County and Jefferson County

Farther out, the pattern is simpler: the cities we checked run their own building departments, and each county handles its unincorporated land.

  • St. Charles County. St. Charles, St. Peters, O'Fallon and Wentzville each issue their own permits. In unincorporated areas, the County Community Development Department's Building and Code Enforcement Division issues permits and contractor licenses.
  • Jefferson County. Arnold and Festus issue their own permits. Festus requires a permit for work that replaces or installs framing, plumbing or electrical, and normally expects sealed architect or engineer drawings for new construction or a major renovation. Unincorporated areas are handled by the Jefferson County Code Enforcement Division.

Local quirks matter. The City of St. Charles requires its own licenses for electrical, plumbing and mechanical subcontractors. When damaged siding or shingles in Wentzville have no suitable match, the whole plane or elevation has to be replaced.

Who issues permits, city by city

The table covers the City, unincorporated St. Louis County and the municipalities we checked for this guide. The last column shows whether the city requires an inspection or occupancy permit when an owner-occupied home is sold. Several cities marked "No" still inspect rentals. This is as of October 2026, so confirm with the city before you rely on it.

Where the house isWho issues building permitsInspection when sold?
City of St. LouisCity Building DivisionYes
Unincorporated St. Louis County (Affton, Mehlville, Oakville and others)St. Louis CountyYes
BallwinCity, including trade permitsYes
BrentwoodCity, including trade permitsYes
ChesterfieldSt. Louis County, after City zoning approvalNo
ClaytonCity; County does electrical inspectionsCheck with the city
Creve CoeurCity; County handles electrical and plumbingNo
CrestwoodSt. Louis County, after a City zoning review permitNo
Des PeresCity; County issues electrical, plumbing and mechanicalNo
FentonSt. Louis County, after City zoning approvalNo
FlorissantCity, including trade permitsYes
KirkwoodCityYes
LadueCity; County issues electricalCheck with the city
MaplewoodCity; County issues electrical, plumbing and mechanicalYes
Richmond HeightsCity; County handles electrical, plumbing and mechanicalYes
Sunset HillsSt. Louis County, after City zoning approvalYes
Town and CountryCity for building and mechanical; County for electrical and plumbingNo
University CityCity, including trade permitsYes
Webster GrovesCity, including trade permitsYes
St. Charles (city)CityCheck with the city
St. PetersCityNo
O'FallonCityCheck with the city
WentzvilleCityNo
Unincorporated St. Charles CountySt. Charles CountyNo
ArnoldCityYes
FestusCityYes
Unincorporated Jefferson CountyJefferson CountyCheck with the county

What usually needs a permit, and what usually does not

The City and the County each publish a list. They overlap but are not the same, and municipalities write their own.

City of St. Louis. A building permit is needed for additions; porches, decks and retaining walls; installing, removing or cutting structural beams, joists or bearing supports; foundation repair; converting a basement or attic to living space; removing or installing any partition in a habitable space; and a new roof that is not like material or replaces more than 25% of the sheathing. Plumbing, mechanical and electrical work need their own permits.

Work that usually needs no City building permit includes ordinary repairs to buildings of up to four units, tuckpointing, plaster patching, painting, floor refinishing, tile and carpet, cabinet installation, gutters, window and door replacement when the opening is not changed, like-for-like roofing with 25% or less of the sheathing replaced, and new aluminum, steel or vinyl siding with no change to openings. There are two exceptions: City historic districts and Landmarks (below), and FEMA flood areas, where a Floodway Development Permit is required even when no building permit is.

St. Louis County. The County requires a building permit to construct, enlarge, alter, repair, demolish or replace, or to convert unfinished space to living space, and it names kitchen remodels, bath remodels and basement finishing as examples. Its exempt list includes painting, tuckpointing, patching plaster and drywall, like-for-like flooring and siding replacement, even with a different siding type. Same-size cabinets and countertops in the same place are exempt, but resetting a sink or toilet or adding a dishwasher needs a plumbing permit. Replacement windows in existing openings are exempt only if they meet conditions on size, opening area, energy performance (a U-factor of 0.34 or less) and safety glass. Hanging new drywall, or adding insulation, furring and drywall to the inside of exterior walls, needs a permit.

Municipalities. Local lists can be broader or narrower. Maplewood requires a permit for any alteration, structural or not, and for general repairs involving two or more rooms. Ladue does not require one for a kitchen remodel limited to replacing appliances and cabinets. Florissant requires permits for water heater replacement and furnace or air conditioner installation, and Town and Country for HVAC and roof replacements.

Licensed trades: who can do electrical, plumbing and mechanical work

Missouri has no statewide general contractor license, so most contractor rules are local. The state does offer an optional statewide electrical contractor license, and cities and counties must accept it in place of their own.

In the City of St. Louis, trade permits follow the license:

  • Electrical permits go to City-licensed electrical contractors. A homeowner can get one only after passing a short Building Division test, only for an owner-occupied single-family home and only to add to, repair or modify an existing system. Service changes, rehab and new construction need a licensed contractor.
  • Plumbing permits go only to City-licensed plumbing contractors. New fixtures, soil stacks, vents, water supply lines and sewer lateral replacements all need one.
  • Mechanical permits go only to City-licensed mechanical contractors, for furnaces, boilers, exhaust fans, hoods and ventilation.

General contractors working in the City need a Construction Industry Contractor Graduated Business License from the License Collector, proof of workers' compensation coverage and a Collector of Revenue clearance. They must also give the License Collector a list of subcontractors on each job.

St. Louis County requires a licensed electrical contractor, master plumber or HVAC servicer-installer contractor for those trades, or a qualifying homeowner, and offers homeowner electrical and plumbing tests ($25 per test as of October 2026). In unincorporated areas and full-contract cities, a residential job that includes trade work is issued as one Integrated Building Permit.

Some municipalities add their own registration. Kirkwood requires every contractor to hold a City Contractor's Business License backed by an insurance certificate naming the City. Ladue charges a $25 annual license fee and requires an insurance certificate. Clayton requires plumbing beyond ordinary repairs to be done by a master plumber licensed by both St. Louis County and Clayton. Our guide to choosing a contractor in Missouri covers licensing, insurance and lien rules in more depth.

Inspections: what to expect

A permit is the start of the oversight, not the end. The 2018 International Residential Code, which the City of St. Louis has adopted, sets out the usual sequence:

  1. Foundation, where there is foundation work.
  2. Rough-in of plumbing, mechanical, gas and electrical work, before anything is covered.
  3. Framing, after the rough-ins pass.
  4. Final, when the work is complete and before anyone occupies the space.

Work is not supposed to go past each stage until it is approved, and it is the permit holder's job to call for each inspection.

  • In the City, the contractor prints the approved trade permit and schedules inspections from the STL City Permits dashboard. The building permit has to be displayed on site, and a dumpster or work that blocks a street or sidewalk needs a separate Blocking Right of Way Permit.
  • In St. Louis County, inspections are scheduled by phone at 314-615-4677.
  • Where a city and the County split the work, the order matters. In Des Peres, the City's framing inspection happens only after the County approves the rough electrical, plumbing and mechanical inspections.
Crew framing exterior walls on a new build
Our crew framing walls on a new build.

Historic districts add a review step

In the City of St. Louis, a house in one of the 18 local historic districts, or one that is a City Landmark, plays by different rules. The Building Division's permit criteria say exterior painting, gutters and downspouts, windows, doors, tuckpointing, fences, awnings and similar exterior work need approval there, and that the Cultural Resources Office (CRO) usually requires a permit even where the building code does not. The Building Division refers those applications to the CRO automatically, and no permit is issued without CRO or Preservation Board approval. Applications that meet the district standards are usually approved within a few days.

Several county cities run their own design or preservation review for exterior work, including Kirkwood's Landmarks Commission, Webster Groves' Architectural Review Board and Maplewood's Design & Review Board. Our guide to renovating in a St. Louis historic district explains what gets reviewed and how to plan for it.

Before you start: three habits that save trouble

Check before you start. Call the building department for your address, describe the work and ask what permits, plans and approvals it needs. Ask whether a zoning approval comes first, as it does in Chesterfield, Crestwood, Fenton and Sunset Hills. Expect to submit drawings for bigger jobs. The County requires plans for new construction, additions and most alterations, and Webster Groves asks for two copies each of the application, the signed contract or scope of work and the construction drawings for a kitchen or bath permit.

Let your contractor pull the permits. In the City, plumbing and mechanical permits can only go to licensed contractors anyway, and whoever holds a permit is responsible for calling its inspections. If someone other than the owner applies for a City building permit, the owner signs a letter of authorization. Put who pulls permits, and who pays for them, in your contract. Modern Design + Build handles design through permit-ready drawings, with architectural drawings and engineering as part of our design and planning services.

Keep the paper trail. Save the permits, approved drawings, inspection approvals and final sign-off with your house records. They matter when you sell. Ballwin says an unpermitted basement finish must be permitted and approved before the house can be sold, and many cities inspect homes at sale. In the City of St. Louis, anyone can see an address's recent building permits through the City's Address & Property Search.

If you are planning a remodel and want help sorting out what it needs, book a free consultation.

Sources
  1. Building Division, City of St. Louis
  2. Permits Section, City of St. Louis Building Division
  3. New online building permit portal, Office of the Mayor, City of St. Louis (March 5, 2026)
  4. Building Permit, City of St. Louis Building Division
  5. Residential Building Permit Criteria, City of St. Louis Building Division
  6. Electrical Permit, City of St. Louis Building Division
  7. Plumbing Permit, City of St. Louis Building Division
  8. Mechanical Permit, City of St. Louis Building Division
  9. Building Codes, City of St. Louis Building Division
  10. Construction Contracting Business license, City of St. Louis License Collector
  11. Residential Occupancy Permits, City of St. Louis Building Division
  12. Address & Property Search, City of St. Louis
  13. History of the Physical Growth of the City of St. Louis, City of St. Louis
  14. Applications and Permit Review, City of St. Louis Cultural Resources Office
  15. City Historic Districts, City of St. Louis Cultural Resources Office
  16. Building Construction: When is a building permit required, St. Louis County
  17. Residential Building, St. Louis County Transportation and Public Works
  18. Requirements for a Permit, St. Louis County
  19. Municipal Contract Agreements, St. Louis County
  20. Code Directory, St. Louis County Transportation and Public Works
  21. Electrical Licensing, St. Louis County
  22. Occupancy Permit Applications, St. Louis County
  23. 2025 Gazetteer Files: Missouri places, U.S. Census Bureau
  24. Building Inspection and Plan Review, City of Webster Groves
  25. Kitchen and Bathroom Permits, City of Webster Groves
  26. Housing Inspections and Property Maintenance, City of Webster Groves
  27. Building Division, City of Kirkwood
  28. Building Remodeling and Repairs, City of Kirkwood
  29. Occupancy and Utilities Sign-Up, City of Kirkwood
  30. Building Division Information and Resources, City of Maplewood
  31. Housing Information and Tenant Rights, City of Maplewood
  32. Building and Occupancy Permits, City of Brentwood
  33. Occupancy, City of Brentwood
  34. Building and Zoning, City of Richmond Heights
  35. Building and Zoning Services, City of Richmond Heights
  36. Building Services, City of Clayton
  37. Planning and Development, University City
  38. Occupancy permit FAQs, University City
  39. Building Department FAQs, City of Ladue
  40. Building Department, City of Ladue
  41. Citizen Portal and contractor licensing, City of Ladue
  42. Building Permits, City of Sunset Hills
  43. Occupancy and Rental Registry, City of Sunset Hills
  44. Permits and Licenses, City of Crestwood
  45. Residential Construction, City of Des Peres
  46. Permit Requirements, Forms and Inspection, City of Des Peres
  47. Building Permits and Inspections, City of Town and Country
  48. Occupancy Permits, City of Town and Country
  49. Building Permits, City of Chesterfield
  50. Re-Occupancy Permits, City of Chesterfield
  51. Building Permits and Occupancy Inspection Information, City of Ballwin
  52. Building Division, City of Creve Coeur
  53. Residential Occupancy Inspection, City of Creve Coeur
  54. Building Permits, City of Florissant
  55. Occupancy Inspection, City of Florissant
  56. Community Development, City of Fenton
  57. Building Division, City of St. Charles
  58. Subcontractor Licensing, City of St. Charles
  59. Residential Real Estate Disclosure, City of St. Charles
  60. Building Safety, City of St. Peters
  61. Certificate of Occupancy Requirements, City of St. Peters
  62. Building and Permits, City of O'Fallon
  63. Building Division, City of Wentzville
  64. Occupancy Requirements, City of Wentzville
  65. Community Development, St. Charles County
  66. Occupancy Permit, St. Charles County
  67. Building and Code Compliance, City of Arnold
  68. Property Maintenance Inspections and Occupancy Permits, City of Arnold
  69. Building and Planning, City of Festus
  70. Residential Building Permit Requirements, City of Festus
  71. Certificate of Occupancy, City of Festus
  72. Code Enforcement, Jefferson County
  73. Licensing Boards, Missouri Division of Professional Registration
  74. Statewide Electrical Contractor FAQs, Missouri Division of Professional Registration
  75. Section 324.925, Missouri Revised Statutes
  76. 2018 International Residential Code, Chapter 1: Scope and Administration, International Code Council
  77. Landmarks Commission, City of Kirkwood
  78. Architectural Review Board, City of Webster Groves
  79. Design and Review Board and Historic Preservation Commission, City of Maplewood

Talk it through

Planning a project in St. Louis? Start with a free consultation.

Free consultation

or call (636) 556-4626

Related services

FAQ

Questions about remodeling permits

Do I need a permit to remodel a kitchen or bathroom in St. Louis?

Usually, once the work goes beyond replacing finishes in place. St. Louis County lists kitchen and bath remodels among the projects that need a building permit, and it requires a plumbing permit even to reset a sink or toilet or add a dishwasher. In the City of St. Louis, installing cabinets needs no building permit, but moving a wall needs a building permit and adding plumbing fixtures needs a plumbing permit. Confirm with your building department before you start.

Can a homeowner pull their own permits?

It depends on the permit. The City of St. Louis takes building permit applications from the owner of record, but its plumbing and mechanical permits go only to City-licensed contractors, and a homeowner can get an electrical permit only after passing a Building Division test, for limited work on an owner-occupied single-family home. St. Louis County allows trade work by a qualifying homeowner and offers homeowner electrical and plumbing tests for single-family primary residences. Municipal rules vary.

How long does it take to get a remodeling permit?

It depends on the jurisdiction and the project. The City of St. Louis says most trade permit applications are approved within one to three business days, though some take up to 10. Brentwood allows up to 10 business days for review, Des Peres seven to 10, Florissant about 10 working days and Ladue about two to three weeks. A required zoning approval or historic district review adds time.

Will unpermitted work cause problems when I sell?

It can. Ballwin says an unpermitted basement finish must be permitted and approved before the house can be sold, and many cities in the region inspect homes at sale. In the City of St. Louis, an address's recent building permits show up in the City's online Address & Property Search. Keeping permits and final inspections on file makes a sale simpler.

Does the City of St. Louis inspect homes when they are sold?

Yes. The whole City is a Housing Conservation District, and a Certificate of Inspection is required before a home is occupied after a sale unless one was issued in the last 12 months. As of October 2026 the fee is $120. Several county cities have their own point-of-sale inspections, shown in the table in this guide.

Free consultation

Let’s talk about what’s possible.

Start with a free consultation. Tell us about the space, how you want to live in it and where you are in the process. We will come back with honest next steps.

(636) 556-4626 admin@moderndnb.com 5822 Gravois Ave, St. Louis, MO 63116

Tell us about your project

A few details help us come prepared. We reply within one to three business days.

Phone photos are perfect. Images only, up to 18 MB in total.

We use your details only to respond to this request. See our privacy policy.

CallFree consultation