Drive through Affton, Mehlville, Florissant, Hazelwood or Ballwin and you will see it on street after street: the one-story ranch, long and low, built in the decades after World War II. If you own one, you may be living with its original kitchen, a closed-off floor plan, and wiring, plumbing and windows that have been in place for decades.
Renovating a ranch is less about preserving period details than about replacing what time has worn out and opening the rooms to how people live now. Here is why St. Louis County has so many ranches, what owners usually change, what to check before you design and how to sequence the work.
- About 53% of St. Louis County's housing units were built from 1950 to 1979, and in Florissant the share is about 84%, according to Census Bureau estimates.
- Most ranch renovations aim for an open kitchen and living area, updated baths, more light and a usable lower level.
- Check before you design: asbestos in some materials of the era, lead paint in homes built before 1978 and aluminum wiring installed from 1965 to the mid 1970s.
- Opening a ranch kitchen often means a bearing wall, an engineered beam and posts carried down to footings in the basement.
- Do the work in order: assess, design, engineer and permit, then structure and systems, then finishes.
Why St. Louis County is ranch country
The ranch is a postwar house, and much of St. Louis County is a postwar place. The county's population grew from 406,349 in 1950 to 703,532 in 1960 and 951,353 in 1970, according to the Census Bureau, while the City of St. Louis peaked at 856,796 in 1950 and then began to shrink. That boom coincided with the ranch's rise: the St. Louis Hills Neighborhood Association, describing the brick ranches south of Francis Park, calls it "a style that became popular after World War II."
Census Bureau estimates for 2020 to 2024 show how much of that era still stands:
| Area | Part of the region | Housing units built 1950 to 1979 |
|---|---|---|
| Florissant | North County | about 84% |
| Mehlville | South County | about 65% |
| Affton | South County | about 60% |
| Hazelwood | North County | about 59% |
| Ballwin | West County | about 57% |
| St. Louis County overall | Countywide | about 53% |
| City of St. Louis | For comparison | about 21% |
Not every one of those homes is a ranch, since the counts include every type of housing, from split-levels to apartments. Still, the typical ranch is easy to picture: one main floor, often over a basement or a walkout lower level, bedrooms down a hall, and a kitchen walled off from the living room.
What owners usually want
The wish list for a ranch tends to be consistent:
- An open kitchen, usually by taking down all or part of the wall to the living or dining room, often with an island or peninsula where the wall stood.
- Updated bathrooms, usually within the existing footprint.
- More light: lighter finishes, better fixtures, wider openings between rooms and, where the roof framing allows, a vaulted ceiling.
- A usable lower level for a family room, guest space or office.
Two of Modern Design + Build's own ranch projects show the pattern. At Ridgedale, a brick and siding ranch, the work included a new kitchen with white shaker cabinets, a peninsula and floating wood shelves, lighter walls and new flooring through the main living spaces, and a refreshed sunroom. At Sennawood, the main floor runs open from the living room through the dining room to a kitchen with a farmhouse sink, with a separate beverage bar, a painted brick fireplace in the family room and a finished lower level.


Hidden issues to check first
Ranches are young next to the city's brick rowhouses, but they were built with the materials and methods of their decades. These are worth checking before you finalize a design:
| Issue | Where it shows up | What to do |
|---|---|---|
| Asbestos | Some flooring, adhesives, textured coatings and pipe coverings of the era | Leave it alone until an accredited professional tests it |
| Lead-based paint | Homes built before 1978 | Hire a lead-safe certified firm for work that disturbs paint |
| Aluminum branch wiring | Cable installed from 1965 to the mid 1970s | Have an electrician confirm it and make a permanent repair |
| Galvanized steel water pipe | Older supply plumbing | Replace it while the walls are open |
| Undersized electrical service | Original service and panel | Get a load calculation before planning the kitchen and HVAC |
| Original windows, thin insulation | Homes that have not been upgraded | Air seal and insulate, and plan windows before finishes |
Asbestos
EPA's list of places asbestos may be found in a home includes vinyl floor tiles, the backing on vinyl sheet flooring and adhesives, textured paint and patching compounds on walls and ceilings, roofing and siding shingles, vermiculite attic insulation, and hot water and steam pipes coated or wrapped in asbestos material. EPA says you generally cannot tell by looking. Its advice is to leave material in good condition alone, have it inspected by a trained and accredited professional if a remodel will disturb it, and leave removal to accredited professionals. Do not sand flooring that may contain asbestos, or its backing; EPA suggests covering it with new flooring when possible.
Lead-based paint
The federal government banned the sale of lead-based paint for homes in 1978, and EPA says 24% of homes built from 1960 to 1978 have some, with older homes more likely to. Under EPA's Renovation, Repair and Painting rule, anyone paid to disturb painted surfaces in a pre-1978 home must be certified and trained in lead-safe work practices. Our lead-safe renovation guide explains what that means for your project.
Aluminum wiring
A copper shortage in the mid 1960s pushed builders to use aluminum wire for ordinary 15- and 20-amp circuits. CPSC says homes built before 1965 are unlikely to have it, but cable installed from 1965 to the mid 1970s may, and a survey done for CPSC found aluminum-wired homes built before 1972 were 55 times more likely than copper-wired homes to have a connection at an outlet reach "Fire Hazard Conditions." Look for "Al" or "Aluminum" on cable jackets in the basement, attic or garage, and have a qualified electrician confirm. CPSC recognizes three permanent fixes (rewiring with copper, or copper pigtails attached with COPALUM or AlumiConn connectors), and a renovation that opens the walls is the easiest time to rewire.
Galvanized pipe and electrical capacity
If the water lines in your basement are gray, threaded steel pipe, they are likely galvanized. Galvanized pipe rusts from the inside, which narrows it and lowers water pressure over time, and EPA notes that lead particles can attach to galvanized pipe and later enter drinking water. Replacing supply lines is far easier while walls and ceilings are open.
The electrical service deserves the same look. A panel sized for the appliances of the 1950s or 1960s may not have room for a modern kitchen, central air, a heat pump or an EV charger. Have an electrician run a load calculation before the kitchen and mechanical plans are final, so any service upgrade is planned rather than discovered.
Windows and insulation
St. Louis County and the City sit in climate zone 4A, where ENERGY STAR recommends bringing an uninsulated attic to R-60, or adding R-49 where there are already 3 to 4 inches, plus R-10 sheathing or R-13 batts on basement walls. If your ranch still has its original windows, plan replacements before interior finishes so trim and drywall returns are done once.
Opening walls in a ranch
In a ranch framed with rafters and ceiling joists, the joists often meet over a wall near the middle of the house, and that wall carries them. If the attic has trusses instead, they may span from one exterior wall to the other and leave interior walls carrying little roof load, but truss designs vary, so a look in the attic is only the start.
The usual approaches:
- A beam in the attic above the ceiling joists, with the joists hung from it, can leave a flat ceiling with the least disruption below, where the roof framing allows.
- A flush beam in the ceiling plane, or a dropped beam where a visible beam is acceptable.
- New posts at each end of the beam, carried through the floor framing to new footings in the basement and planned around ductwork and the main basement beam.
A vaulted ceiling is a bigger step. Ceiling joists often tie the bottoms of the rafters together so the roof cannot spread, so removing them takes an engineered substitute such as a structural ridge beam. Our guide to removing a load-bearing wall covers beams, shoring, permits and costs in detail.
Making the lower level livable
A basement or walkout lower level is space you already have: the foundation, floor and roof are in place. Before you finish it:
- Fix water first. Gutters, grading and wall cracks come before framing and drywall.
- Test for radon. EPA says all homes should be tested and calls radon the second leading cause of lung cancer. Test before you finish so any fix can be planned with the work.
- Plan egress. Under the 2018 International Residential Code, a new bedroom in an existing basement needs its own emergency escape and rescue opening, such as an egress window. A walkout can make this easier.
- Get the permit. In the City of St. Louis, for example, converting a basement to living space requires a building permit.
- Work around the mechanicals. Ducts, pipes and beams set the ceiling height and shape the layout.
At Sennawood, the lower level became a carpeted family room with recessed lighting as part of the renovation.

How to sequence a whole-home ranch renovation
On a one-story house, nearly every trade works on the same floor, so order matters. A sequence that avoids doing anything twice:
- Assess. Walk the attic, basement, electrical panel and plumbing with your contractor. Test suspect materials for asbestos, check painted surfaces for lead and test for radon.
- Design the whole house, even if you will build in phases. Settle the layout, kitchen, baths, lighting and mechanical routes together.
- Engineer and permit. Size beams, posts and footings, then submit drawings to the building department.
- Abate before demolition. Any asbestos removal comes first, done by accredited professionals.
- Demolish and build the structure. Shore, set beams and posts, pour footings and frame new walls.
- Rough in the systems. Upgrade the electrical service and rewire, replace old supply piping, reroute ductwork and pass rough inspections.
- Insulate, air seal and install windows while the walls and attic are open.
- Finish the interiors: drywall, then cabinets, tile, flooring, trim and paint.
- Close out with final connections, inspections and a walkthrough.
If you are phasing the work, do the infrastructure first: the electrical service, main plumbing lines and anything structural. Then finish rooms in an order that never sends a crew back through a finished space. Plan where you will live, too, because when the main floor is the job site it is hard to stay. Our remodel timeline guide explains what drives the calendar.
Modern Design + Build takes on whole-home renovations like these from design through construction, and our design services cover architectural drawings, engineering, interior design and 3D renderings. See our whole-home renovation and kitchen remodeling services, or book a free consultation to talk about your ranch.
- Population of States and Counties of the United States: 1790 to 1990 (1996), U.S. Census Bureau
- Year Structure Built (Table B25034), ACS 2024 5-year estimates, U.S. Census Bureau via Census Reporter
- Parks and Architecture, St. Louis Hills Neighborhood Association
- Learn About Asbestos, U.S. EPA
- Protect Your Family from Exposures to Asbestos, U.S. EPA
- How Can I Tell If My Home Contains Lead-Based Paint?, U.S. EPA
- Lead Renovation, Repair and Painting Program, U.S. EPA
- Repairing Aluminum Wiring, Publication 516 (June 2011), U.S. Consumer Product Safety Commission
- Concerned About Lead in Your Drinking Water? (2017), U.S. EPA
- Galvanization: Piping, Wikipedia
- Recommended Home Insulation R-Values, ENERGY STAR
- Guide to Determining Climate Regions by County (2015), Pacific Northwest National Laboratory for the U.S. Department of Energy
- Radon, U.S. EPA
- 2018 International Residential Code, Chapter 3, Sections R310.1 and R310.6, International Code Council
- When a Residential Building Permit is Needed, City of St. Louis