
Lafayette Square, City of St. Louis
Renovating townhouses in Lafayette Square
About two-thirds of the historic buildings around Lafayette Park are Italianate or mansard style, a group of post-Civil War townhouses the National Register nomination calls unparalleled in Missouri. We plan their kitchens, baths and full renovations around the Lafayette Square standards.
Lafayette Square fills the blocks between Chouteau Avenue, I-44, Dolman Street and South Jefferson Avenue, and its center is the park. In 1836 the city set aside about 30 acres of its old Commons as a public square, dedicated it as Lafayette Square in 1851 and renamed it Lafayette Park in 1854, and landscape gardener Maximilian G. Kern designed it between 1864 and 1869. Construction of the neighborhood's Second Empire townhouses peaked in the two decades beginning in 1865, and Lafayette Square was one of the first St. Louis neighborhoods to introduce and widely adopt the mansard roof.
By 1890 the neighborhood had reached the height of its development as an exclusive residential district, and the tornado of May 27, 1896, brought some irreversible loss. The houses that remain have had well over a century of repairs and updates. For owners today, most of the work happens inside: kitchens that fit a townhouse plan, bathrooms on the upper floors, new wiring and heating, and careful repair of plaster and woodwork. The outside answers to the district standards, so exterior items are planned around that review from the start.
Places you will know
- Lafayette Park
- Benton Place
- Park Avenue
- Mississippi Avenue
- Missouri Avenue
- Kennett Place

Local homes
Italianate and mansard townhouses with stone fronts
The National Register district holds about 550 contributing buildings built between about 1860 and 1935, predominantly single- or double-family two-story brick houses, whether detached, semi-detached or attached, plus a number of four-family buildings. About 66% are Italianate or mansard in style, 20% Revival, 8% Craftsman and 5% Greek Revival. The typical Second Empire townhouse has two full stories under a third-floor mansard with dormer windows, a limestone or sandstone front, and brick side and rear walls. Stone fronts, once reserved for the wealthy, became common around 1870 and 1871 as new quarries were developed, and after 1890 the prevailing mode turned to houses built completely of red brick.
Renovation in these houses tends to circle the same three questions. The third floor under the mansard is the usual place to look for an extra bath or bedroom, and plumbing it means running drain, vent and water lines down through two finished floors. Original plaster, woodwork and stairs need protecting while new wiring and plumbing go in. And because dormers, cornices and stone fronts belong to the exterior, any change to them falls under the district standards. Installing a new boiler or furnace also takes a mechanical permit, which the City issues to licensed mechanical contractors it has certified.
Services
What we build in Lafayette Square.

Kitchen remodeling in Lafayette Square
In a townhouse plan, the kitchen has to work with the stair, the side walls and the windows you already have. We settle the layout on paper and in 3D renderings before demolition starts.
Learn more
Bathroom remodeling in Lafayette Square
A new bath on the mansard floor, or a rebuilt one on the second, starts with routing drains and vents through the floors below. We plan those runs to protect plaster ceilings and trim.
Learn more
Whole-home renovation in Lafayette Square
Whole-house work here pairs new wiring, plumbing and heating with careful plaster and millwork repair, sequenced so finished rooms do not get reopened.
Learn more
Historic restoration in Lafayette Square
Exterior work is reviewed against the Lafayette Square standards, enacted in April 2012 and updated in February 2019. We prepare the drawings that review needs and restore original plaster, trim and stairs inside.
Learn moreLafayette Square was declared a City historic district in 1972 and is governed today by Ordinances #69112 and #70926. The Building Division refers permit applications here to the Cultural Resources Office automatically, and no permit is issued without CRO or Preservation Board approval. Applications that meet the standards are usually approved within a few days; small projects like fences and decks can be approved at the CRO Hotspot desk in City Hall, and larger projects can ask for a free Preliminary Review; those that receive preliminary approval get expedited review when the permit application is filed.
The application itself goes in online, through the STL City Permits portal, and in a historic district the City adds exterior painting, windows, doors, gutters and tuckpointing to the list of work that needs approval.
Guides
For Lafayette Square homeowners.

St. Louis historic districts
In a City of St. Louis historic district, exterior work from windows to paint can need Cultural Resources Office approval before a permit is issued. What gets reviewed, how long it takes and how to plan.
Read the guide
St. Louis flounder houses
St. Louis may have the largest surviving collection of flounder houses, small brick homes with one tall blind wall and a single sloping roof. Their history, and how to renovate one with care.
Read the guide
St. Louis brick homes
Why St. Louis built in brick, how solid masonry walls handle water, and what owners should know about repointing, sealers, insulation, exposed brick and historic review.
Read the guideFAQ
Remodeling in Lafayette Square: common questions
Can I replace the windows on my Lafayette Square house?
Not without review. Window and door replacement in a City historic district goes to the Cultural Resources Office even when the building code would not require a permit, and the Lafayette Square standards, last updated in February 2019, set what is acceptable. Read them, or ask for a free Preliminary Review, before you order anything.
Do I need a permit to finish the third floor?
Yes, if attic space becomes living space; that conversion needs a City building permit, as does removing or adding partitions in finished rooms. A new bathroom up there also needs its own plumbing permit, and any change to dormers or the roof is an exterior change subject to district review.
How long does historic review take?
The Cultural Resources Office says applications are usually approved within a few days, unless the work does not comply with the standards or more information is needed. Plan extra time if your project needs Preservation Board approval.
Free consultation
Planning a project in Lafayette Square?
Tell us about your home and what you want to change. The first consultation is free, and we reply within one to three business days.
- Lafayette Square Neighborhood Overview, City of St. Louis
- Lafayette Square, Neighborhood Histories by Norbury L. Wayman, City of St. Louis
- Lafayette Square Historic District, National Register nomination, Missouri State Historic Preservation Office
- Lafayette Square Historic District, Cultural Resources Office, City of St. Louis
- Residential Permit Criteria, Building Division, City of St. Louis
- Applications and Permit Review, Cultural Resources Office, City of St. Louis
- City of St. Louis Launches New Online Building Permit Portal, Office of the Mayor (March 5, 2026)
- Mechanical Permit, Building Division, City of St. Louis
